Advanced TreatmentWater

Groundwater Replenishment System, Orange County, California

The Groundwater Replenishment System project received the Award of Excellent from the Consulting Engineers and Land Surveyors of California, Orange County Chapter, for exceptional design and technical superiority. Beyaz & Patel contributed to the three billion dollar program by providing structural engineering services for the design and construction of the following advanced water facilities and structures:

  • Microfiltration process facility and control room;
  • microfiltration break tank/reverse osmosis transfer pump station;
  • microfiltration backwash waste equalization tank; and a
  • generator building.

The groundwater replenishment system was designed to produce 23.4 billion gallons of purified water annually and serve 140,000 families in Orange County.Orange County Water District and Orange County Sanitation District

Owner: Orange County Water District and Orange County Sanitation District