Advanced WaterGroundwaterMicrofiltrationWater

Santa Margarita Conjunctive Well Water Use Project, Fallbrook, California

Santa Margarita Conjunctive Well Water Use Project, Fallbrook, California

This multi-jurisdictional project includes the U.S. Marine Corps (USMC), U.S. Department of the Interior, Bureau of Reclamation (Reclamation), and Fallbrook Public Utility District (FPUD). Beyaz & Patel, under contract with the FPUD, provided structural engineering services for the advanced water treatment plant that will allow Camp Pendleton and the City of Fallbrook to utilize well water from the Santa Margarita river basins. The project includes the following:

  • Return flow control facility;
  • Equalization steel tank;
  • Iron and manganese filtration;
  • Reverse osmosis feed tank;
  • Booster pump station;
  • Reverse osmosis building;
  • Clearwell tank and pump station;
  • Chemical facilities;
  • Waste washwater storage tank;
  • Drying bed modifications; and
  • Gheen facility pump station and reservoir.